News Center
Latest News

Taipower, CPC to invest jointly in geothermal power plants

2018-03-29

Taipower, CPC to invest jointly in geothermal power plants

2018/03/28 21:54:51

CPC Chairman Tai Chien (戴謙, left) and Taipower Chairman Yang Wei-fuu (楊偉甫)

Taipei, March 28 (CNA) State-run utility Taiwan Power Co. (Taipower) and oil refiner CPC Corp. Taiwan (CPC) signed a memorandum of understanding Wednesday to invest in two geothermal power plants in Yilan County, the Ministry of Economic Affairs (MOEA) said.

The project will begin in the county's Renze area with the construction of a 2 MW geothermal power plant that will have the capacity to supply electricity to about 3,000 households for a year after it becomes operational in 2022, the MOEA said.

According to Taipower, the Renze plant will be built at cost of approximately NT$600 million (US$20.57 million), and a second geothermal plant will be set up later in Tuchang.

When both plants are completed, they will have a total capacity of 8 megawatts, Taipower said.

Taipower Chairman Yang Wei-fuu (楊偉甫) said the company has a good relationship with CPC and is looking forward to their joint efforts to develop green energy.

In recent years, the development of renewable energy has been accelerating, and geothermal power generation technology capabilities have also been improving, said Yang, adding that Taiwan has good potential in that field. 

(By Lin Meng-ju and William Yen)
Enditem/pc

索賄或收賄申訴專線

  1. 本公司所有人員絕不接受任何廠商及其下包商給予賄賂或其他不正利益。
  2. 公司任何人員如有向廠商及其下包商索賄而違反前述聲明者,請具名逕向本公司檢舉、申訴,本公司必將嚴查;受理單位為稽核室,郵電地址:report@bes.com.tw 電話:(02)8787-7735、(02)8787-6522 ; 傳真:(02)8787-6250。
  3. 任何廠商及其下包商皆不得違反前述聲明,否則須自負一切法律責任。
  4. 非檢舉索收賄,請改撥 總機:(02)8787-6687